News

33 Printing And Packaging Companies Were Notified By The Inspector Team

Nov 29, 2018 Leave a message

33 printing and packaging companies were notified by the inspector team


We are a big printing company in Shenzhen China . We offer all book publications, hardcover book printing, papercover book printing, hardcover notebook, sprial book printing, saddle stiching book printing, booklet printing,packaging box, calendars, all kinds of PVC, product brochures, notes, Children's book, stickers, all kinds of special paper color printing products, game cardand so on.

For more information please visit 

http://www.joyful-printing.com.   ENG only    

http://www.joyful-printing.net 

http://www.joyful-printing.org

email: info@joyful-printing.net


From November 1st to November 17th, the intensive supervision work of the key areas of the Blue Sky Defence War continued in 2018-2019. The working group found 33 environmental problems in printing and packaging enterprises.


33 printing and packaging companies were notified by the Ministry of Environmental Protection


From November 1st to November 17th, the intensive supervision work of the key areas of the Blue Sky Defence War continued in 2018-2019. The working group found 33 environmental problems in printing and packaging enterprises.


The types of problems discovered by the Ministry of Environmental Protection mainly include the failure to implement VOCs remediation requirements, the installation of pollution control facilities, the “disordered pollution” enterprises have not completed rectification, the contingency plans have not been strictly implemented as required, the pollution control facilities are not functioning properly and other gas-related environmental problems.


Blue sky defense war supervision content


According to the "Enhanced Supervision Program for Key Areas of the Blue Sky Defence War of 2018-2019" issued by the Ministry of Environmental Protection, the main inspection contents are as follows.


(1) Comprehensive rectification of "disorganized pollution" enterprises


Whether according to industrial policies, industrial layout planning, and land, environmental protection, quality, safety, energy consumption and other requirements, formulate “disintegration and pollution” enterprise remediation plans and standards; whether to implement classified disposal according to the principle of “first stop and then rule”; Complete rectification as required; whether there are “disintegrated” enterprises outside the list; whether there is a resurgence of “disorganized” enterprises that have been banned.


(II) Governance of environmental problems in industrial enterprises


Investigate the installation, operation and discharge of environmental protection facilities of gas-related industrial enterprises. It is important to check whether the pollution prevention and control facilities are constructed as required; whether there are abnormal operation of pollution prevention and control facilities, excessive discharge, temporary suspension of production for the purpose of escaping on-site inspections, and opening of emergency discharge channels in non-emergency situations, such as evading supervision; Whether sulfur dioxide, nitrogen oxides, particulate matter, and volatile organic compounds (VOCs) in key areas fully implement the special emission limits of atmospheric pollutants; whether there are unorganized emissions to key industries such as steel, building materials, nonferrous metals, thermal power, coking, and foundry, and coal-fired boilers Effective control measures are taken; whether deep treatment is carried out on unorganized emissions such as transportation, loading, unloading, storage, transfer and process of materials (including waste).


(III) Implementation of peak production


Is it necessary to formulate a “one enterprise, one policy” heating season peak-peak production plan and implement differentiated management; check the list and plan to check whether the relevant enterprises are required to limit production or stop production; if the enterprise fails to complete the governance transformation task on time, is it Incorporate the local peak production plan and implement the shutdown; whether the industrial furnaces and kiln not included in the management list are included in the autumn and winter peak production plan.


(4) Implementation of emergency measures for heavy pollution weather


During the emergency start-up of heavy polluted weather, whether according to the requirements of the local heavy pollution weather emergency plan, timely release the corresponding level of early warning and start the emergency plan; whether the cities have formulated a list of heavy pollution weather emergency emission reduction projects, and whether each enterprise (unit) implements according to the requirements of the plan Emission reduction measures.


Scope of supervision


(1) Beijing-Tianjin-Hebei and surrounding areas include Beijing, Tianjin, Shijiazhuang (including Xinji), Tangshan, Baoding (including Dingzhou), Langfang, Zhangzhou, Hengshui, Handan, Xingtai, Shanxi Taiyuan, Yangquan, Changzhi, Jincheng, Jinan, Zibo, Liaocheng, Dezhou, Binzhou, Jining, Heze, Shandong Province, Zhengzhou (including Gongyi), Xinxiang (including Changchun), Hebi, Anyang (including Huaxian), Jiaozuo (including Jiyuan) ), Puyang, Kaifeng City (including Lankao) (hereinafter referred to as "2+26" city).


(2) 11 cities in the plains include Luliang, Jinzhong, Linyi and Yuncheng in Shanxi Province, Luoyang and Sanmenxia in Henan Province, Xi'an, Xianyang, Baoji, Tongchuan, Weinan and Yangling Demonstration Zones in Shaanxi Province.


(3) The Yangtze River Delta region includes Shanghai, Jiangsu, Zhejiang, and Anhui provinces.


Inspection time


The first phase (June 11, 2018 to August 5, 2018), a total of 4 rounds. Implementation of other measures stipulated in the "2+26" city "disorganized pollution" enterprise rectification, the elimination of coal-fired boilers, the rectification of the supervision of the Ministry, and the "Action Plan for the Comprehensive Management of Air Pollution in the Autumn and Winter of 2017-2018 in Beijing, Tianjin and the Surrounding Areas" Carry out "looking back." Sort out the hot grid, the people's complaints and reports, and focus on discovering new gas-related problems.


The second stage (August 20, 2018 to November 11, 2018), a total of 6 rounds. Conduct comprehensive inspections on “2+26” cities and 11 cities in the Plains of the Plains, and investigate problems in industrial furnaces, mines, mines, small thermal power plants, implementation of “transfer irons”, dust control and straw burning. To guide and urge all tasks and measures to be put in place.


The third stage (November 12, 2018 to April 28, 2019), a total of 11 rounds. Focus on supervising the implementation of the autumn and winter emission reduction measures in the “2+26” city, the 11th city in the plain, and the Yangtze River Delta region, and check the implementation of various measures to deal with peak production and heavy pollution.


Each inspection team on-site inspection for 2 weeks, a total of 21 rounds of supervision.